![]() ![]() ![]() ![]() I suggest working with a consultant or VAR that specializes in engineering firms such as yours. Https:/ Opens a new window / / tag/ remote-graphics It may be now possible to use remote protocols to do drafting over the WAN. To solve the problem for many years.Ī proper document management system would help you with checkin and checkout issues. Riverbed has been the standard technology. There are thousands of firms doing what you are doing. Http:/ Opens a new window / / support/ autocad/ troubleshooting/ caas/ sfdcarticles/ sfdcarticles/ WAN-Acceleration-Hotfix.html Http:/ Opens a new window / features/ accelerating-autocad-over-the-wan Riverbed is designed to optimize data transfer over the WAN to compress, deduplicate, and do protocol optimization. I have not really used Sharepoint before, we dont really need all the internal sites set up for each project so I was wondering if anyone had any other solutions or if Sharepoint is the way forward? So that we can avoid conflicts etc.ĭue to the size of these projects I am not sure that DFS would be an appropriate solution and our Vendors have suggested setting up Sharepoint on site as a solution. We are looking for a way in which we can sync either all the projects or just the select few that office B need to work on. We have thousands of project folders on the system at the moment, some of our largest projects are in the region of 20GB made up of 11k files. Currently office B has no server infrastructure but we will be putting something in place soon. Due to the programs that we use we cannot use Terminal services to solve everything. However this situation is far from perfect and i am sure some users will forget to copy information back to the main server. They currently have to copy anything they are working on to their local drives and when they are finished with the file they copy it back. The offices have a site to site VPN connection but the remote office (Office B) finds it slow to open files and resources etc. We have this slight issue were we have 2 offices but all the users in both offices need to work on the projects that are stored at one office (Office A).There is no clear ownership over projects, Office A and B can work on the same projects for instance. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |